The new hall fits in between two existing buildings, linking all three together. The hall was constructed using a reinforced concrete foundations and slab, glulam structure and timber framed envelope finished in linear weatherboards.
The hall was constructed during the normal operating hours of the school and extra effort was made to ensure as little disruption as possible to the day to day functioning of the school.