11,000m2 GFA cold store warehouse including 11 bay Environmental load out areas (ELA), along with associated Office space, and Blast Freezers.
Excavation, retaining and piling to found building extension below several metres of unsuitable material. Slab on grade with Structural Steel frame. A combination of PC Panel/Metal cladding facades and roof. Upgrade to services for the purpose of higher spec requirements for clients new Racking system.
This was a challenging project, requiring minimal disruption to on-going Warehouse operations and close coordination with separate contractors.