The challenge
The site posed some challenges with respect to existing geotechnical conditions all of which were incorporated into the design – bulk fill to form a raised building platform and driven timber piles. Post tensioned floor slabs provided the seamless floor that our client required for longevity and low maintenance.
Working closely with local utility companies we were able to find the best outcome for the client with respect to several existing services encroaching into the property boundaries.