11,000m2 GFA cold store warehouse including 11 bay Environmental load out areas (ELA), along with associated Office space, and Blast Freezers.
Slab on grade with a combination of Insulated Panel, Metal Cladding and other architectural finishes to building façade. Office fitout and full services packages included. Futureproof build to provide facility to adjust areas not temperature controlled on completion to Coolstore areas at a later date.
A Challenging Project undertaken during multiple seasonal changes with special consideration required for local climatic conditions.