The details
Distribution centre works included: Warehouse, Coolstores, Dry Goods Store, ELA, Loading Docks and Exterior Envelope. Works included: new heated door sills to cold stores, new cold store doors, new loading dock doors, floor scrubbing, epoxy flooring, roofing repairs and a building wash; along with overseeing a refrigeration plant upgrade.
This project also involved the refurbishment of the 750m2 office area. Fitout works included: demolition of existing partitions, Air conditioning repairs, ceiling repairs, uplift and replace carpets and vinyl, new staff cafeteria kitchen joinery, bathroom and changing room upgrade, new partitions and glazing, and decoration throughout.