The challenge
A significant cut, and removal of existing materials, was required across the entire site, so we focused on achieving a precise and efficient construction programme in consultation with the project’s Architect and Engineers. Despite the complexity of this planning, site activities worked in well with each other and haul roads used for taking earthworks spoil off the site did not isolate any live construction areas. The construction project includes a 1540sqm coldstore, a 440sqm chiller, a 1600sqm dry store and more than 900sqm of environmental load areas (ELAs). Special-purpose facilities include a plant room, forklift recharge room and a large drive-through canopy. We constructed four-metre-high timber retaining walls to stabilise areas along the boundary where deep excavations were necessary. The project has a clear safety and environmental record.