Dominion Breweries Bar Refurbishment

Q Interiors completed the refurbishment of DB Breweries new bar at their head office in Bairds Rd, Otahuhu.

This project involved a complex array of products and finishes all completed within a tight timeframe.

The existing bar was stripped out including the removal of structural walls, with new partitions and ceilings installed. The existing raised floor was extended, with the existing ceiling removed and lowered to create a level surface.Ê Steelwork was installed to support the new wall openings with walls and ceilings relined in MDF.

Walls and ceiling had a mixture of finishes including powdercoated steel mesh panels, solid oak panelling, aluminium framed glazed partitions and painted gib surfaces. Solid oak flooring was laid to match existing, and new joinery included a new 6 metre long concrete bartop was installed.

Client
Dominion Breweries
Project Value
$320,000
Completed
6 Weeks